Flanged scaffolding system can be used both as facade workon scaffold and as high load bearing capacity undermold shoring scaffold by having rigid joining points without need of too many joining components. Flanged facade workon scaffold’s length can be arranged between 1-3 meters with a standart 70 cm horizontal depth. By adding castors to the lower adjustable jacks, it can be used as mobile workon scaffold
PROP COMPONENT (6 FLANGED )WİTH 50 CM FLANGE GAP |
PROP COMPONENT (3 FLANGED) WİTH 50 CM FLANGE GAP |
HORİZONTAL CONNECTİON COMPONENT |
LOWER ADJUSTMENT COMPONENT |
ADJUSTABLE 4 WAY HEADİNG |
FOUR-WAY HEADİNG |
UPPER ADJUSTMENT COMPONENT WİTH U HEAD |
UPPER ADJUSTMENT COMPONENT WİTH T HEAD |